So since we have a new back door leading out onto this fabulous deck, Scott filled in the old back door. It was a smallish project-it only took about an hour. Here Scott is starting to rip up the old door:
He was very careful so he wouldn't damage the door. We want to reuse as much as possible while we're renovating, so whenever there is a piece of wood that is undamaged or the old window or this door, we save it for later. This door will later go between the garage and the concrete pad in the side yard (but that's a project far, far in the future).
Once he got the door out in one piece it was just a matter of framing:
And then filling it in with plywood:
So no hole!
We still need to put new siding over this spot, but this will be tricky, since we don't know if we can match the color of the siding exactly. We also still need to insulate, drywall, and paint, but just like the back door, we can't fill it all in until the inspector comes to take a look. As soon as we finish the railing on the deck we will be able to call and set up an appointment to meet with him.
Exciting!
No comments:
Post a Comment